Not sure of your needs? See all services or contact us.

Your next home.

Custom homes and renovations built to last. We specialize in new home builds, kitchen and bathroom remodels, and whole-home upgrades. Designed for modern living.

Renovated white kitchen with a marble-look quartz waterfall island, white oak hood and brass pendants

Kitchen renovation in Etobicoke, 2023. See the project

Before and after

The same rooms, transformed by our team.

Original kitchen with maple shaker cabinets, curved island and beige floor tile
Before
Renovated kitchen with charcoal cabinets and walnut island
After

Same room, same footprint. The layout stayed; the storage, island and finishes didn’t. See the project

Original condo kitchen with maple cabinets, dark counter and tile floor
Before
Renovated condo kitchen with white cabinets and stone peninsula
After

Flooring now runs continuously from the entry through the kitchen. See the project

Lower level with grey carpet, textured ceiling and a support post
Before
Finished lower level family room with light flooring and a games table
After

An unused lower level turned into a family games room. See the project

Original living area with bare subfloor, beige walls and a single window
Before
Furnished open living and dining area with a large window onto the trees
After

Closed-in rooms opened into one bright living and dining space. See the project

  1. 01 / 05

    Consultation and site visit

    We meet at your home to understand your goals, assess the structure and mechanical systems, and outline what can be achieved within your budget.

  2. 02 / 05

    Design and written quote

    Drawings, selections and an itemized quote. Items not yet selected are listed as stated allowances, and every payment in the contract is tied to completed work.

  3. 03 / 05

    Permits and preparation

    We manage engineering, permit applications and utility locates, and order long-lead materials early so the schedule never waits on a delivery.

  4. 04 / 05

    Construction

    Your project manager coordinates every trade and inspection and sends a written progress update each week. Any change is priced and approved in writing before work proceeds.

  5. 05 / 05

    Handover and warranty

    We walk the finished project with you, resolve every deficiency and provide your warranty documents. After you move in, our team remains your point of contact.

Why our work carries a seal

In Chinese tradition, a seal is a signature. In Ontario, an engineer’s seal on a drawing means a qualified person stands behind it. Ours means the same thing.

At completion, our team walks the finished work with you, resolves every deficiency and signs the project off. The character on our seal is 筑, “to build”.

Have a project in mind?

Book a consultation with our team. We’ll assess your home, review the options with you and follow up with a detailed written quote.